Sunday, September 13, 2015

Dagger board, rub rails, trunk trim. Milestone 1 complete!

Today is a milestone. All wood parts are fabricated and installed on hull. Still much to do but getting closer now.

Well starting to paint the hull before finishing construction was a minor mistake. I thought it might be easier but I was wrong. I had to be very careful adding the rub rails and the cap for the trunk so as I didn't ruin the paint job.

Daggerboad is now laminated, shaped and stops added.























Trunk cap installed. First coat of epoxy on the daggerboard hanging in the background. The final piece, the port side rub rail, was added!

No comments:

Post a Comment